4. In which ways is the initiative creative and innovative?
|
The CTC mobile application was developed during 6 months started with the requirements gathering, collecting Business Rules and new requirements from different parties and stake holders. Then a scope of work was defined to set up the functionalities required to provide the best service for every participant.
This came after a feasibility study to address the benefits and drawbacks of the potential application.
The next step was the Analysis of the system against the requirements and scope of work on time oriented basis. Then the detailed design took place to define and design every small detail to implement in the system. The Detailed design phase went smooth and integrates with the previous steps. The implementation was given to one of the big IT software houses in Kuwait .Finally the integration with the existing systems was the tricky part and heavy testing with different Scenarios.
The testing phase went throw an international information security and performance monitoring company which provided positive feedback for the application (attached the security report)
The overall vision of the solution application was to reach and deliver the user needs with a proactive and inspective way.
|
|
5. Who implemented the initiative and what is the size of the population affected by this initiative?
|
The System was developed during participation of different authorities, mainly the CTC IT department and business consultants working to analyze the data needed and surveys to serve the related sectors, contractors … etc. needs.
The development team is keeping getting feedback from the application users involving enhancing current services, look and feel and performance watching the daily increase in download count.
|
6. How was the strategy implemented and what resources were mobilized?
|
The CTC mobile application has been developed using the latest technologies in mobile development environments Which has the following team members:-
1 –System Analyst
2 – Project manager
3 – Developers
4 –Tester
5 – Implementer
The team members have been working together during the development time until the delivery date in collaboration and continuous enhancements.
This was all under the supervision of CTC IT department team and the central tenders committee funded the cost of the application.
|
|
7. Who were the stakeholders involved in the design of the initiative and in its implementation?
|
The outputs that contributed to the success of the initiative is
- Online open tenders service
- Online Tenders advertisement service
- Online Tenders awards service
- Online primary insurance dates service
- Online private sectors classification service
- Online open bidding service
- Meetings and weekly closings of awards.
|
|
8. What were the most successful outputs and why was the initiative effective?
|
The team has been using Microsoft project software bundle to manage the development plan and follow up with the progress, deliverables and dependencies and resource management to watch progress and evaluates the continuous
activities
|
|
9. What were the main obstacles encountered and how were they overcome?
|
The main obstacles we faced is to introduce huge amount of information in user friendly interface which suitable for smartphones to overcome this, we used user-friendly user interface components such as one touch easy access.
|