4. In which ways is the initiative creative and innovative?
|
The following steps have been taken in the implementation in STS ( ATUS Akıllı Toplu Taşıma Sistemi)
* The transfer to digital enviroment of the 4000 estimated public transport stations with the use of coordinations,directions,names,photographs and physcial status.
The transfer of bus and tram routes to a digital enviroment
The calculation of the algorithm to determine when a transport will arrive at a bus stop or tram station.
The preparation of required programming and scripting.
Testing of the required programming and scripting.
The opening of atus.konya.bel.tr to the public.
The publishing of Konya app in Google Store and App Store
The installation of monitors at stations
The installation of square barcodes at stations
5569 SMS system being released for use.
The Voice Call system testing for use.
|
|
5. Who implemented the initiative and what is the size of the population affected by this initiative?
|
90% of the project has been done in the body of the Municipality. Only in the preparation of the mobile app and voice call system were benefited from the private sector.
|
6. How was the strategy implemented and what resources were mobilized?
|
6. Financing has been completely provided by Konya Metropolitan Municipality.
The design of the project,implementation,tracking and followups and development stages have been done with Municipality resources and personnel.
|
|
7. Who were the stakeholders involved in the design of the initiative and in its implementation?
|
1. From the scripts which form the core of system, the use of the most realistic reulting algorithms.
Keeping in mind, traffic status and time zones, probable situations and probably developments are all kept in mind while estimates are being made.
2. Use of all possible communication channels.
3. Keeping record of transports via; photographs, physical status and visual properties.
4. Constant observation of the algorithm and system.
5. Taking note of feeback from users regarding the system
|
|
8. What were the most successful outputs and why was the initiative effective?
|
All applications and programming were held to testing periods.
Also it was made sure that applications used were appropriate to international standards.
An automated response system for both positive/negative feedback was implemented.
|
|
9. What were the main obstacles encountered and how were they overcome?
|
9. To make use of the designed algorithms and programming first of all the routes and stations for the public transports had to be transferred to a digital enviroment. This part of the project required much effort. The Municipality formed teams regarding this subject to have the necessary processes made.
Information regarding on how to use the STS ( ATUS Akıllı Toplu Ulaşım Sistemi ) was distributed through public transports,billboards located throughout the city, on the website and channels such as these.
|