Etat membre Bangladesh
Nom de l'institution Central Procurement Technical Unit
Type d’institution du secteur public Ministère
Type de ministère Implementation Monitoring and Evaluation Division, Ministry of Planning
Niveau administratif National
Nom de l’initiative Making Institutions inclusive and ensuring participation in decision making
Années opérationnelles du projet 11
Site de l'institution www.cptu.gov.bd

Question 1: À propos de l'initiative

Est-ce une initiative du secteur public ? Oui

Question 2: Catégories

L'initiative est-elle pertinente pour l'une des catégories de l'UNPSA? Making institutions inclusive and ensuring participation in decision-making
UNPSACriteria
2017.2.1 Introduces an idea, policy, practice or structure that is distinctively new, innovative and unique in the context of a given country or region Enhance the formal and informal participation of all individuals and groups in public decision-making processes or policies, approaches and measures related to public services and other aspects impacting on their lives. Institutionalize and/or strengthen participatory decision-making and consultation processes at the national and local level
2017.2.4 Promulgates new or strengthens existing legislation, policy, regulation or measure to fight discrimination, exclusion and exploitation, and to extend access to public services and developmental opportunities, assets and resources for all, including women and girls, and the poorest and most vulnerable.
2017.2.5 Promotes the application of the existing legal and regulatory framework relevant to anti-discrimination and inclusion, or develop additional laws and regulations that foster changes in norms, attitudes and behavior that combat discrimination, including through promoting diversity, dialogue, interaction and collaboration.
2017.2.8 Institutes, nationally and/or locally, multi-stakeholder engagement processes.
2017.2.9 Enhances responsiveness of government to the demands and needs of citizens and ensures the inclusion of the views of concerned sections of the community in public affairs.

Question 3: Objectifs de développement durable

L’initiative est-elle pertinante pour l’une des 17 ODD ? Oui
Si vous avez répondu oui ci-dessus, veuillez préciser quel ODD est la plus pertinente pour l'initiative.
12 Consommation et production responsables
A quel(s) objectif(s), parmi les ODD mentionnés ci-dessus, correspond(ent) l’initiative ?
12.7 Promouvoir des pratiques durables dans le cadre de la passation des marchés publics, conformément aux politiques et priorités nationales

Question 4: Date de mise en œuvre

L’initiative a-t-elle été mise en oeuvre depuis deux ans ou plus ? Oui
Veuillez préciser la date de la mise en oeuvre 23 août 2011

Question 5: Partenaires

Est-ce que les Nations Unies ou toute autre organisation des Nations Unies a été impliquée à cette initiative? Oui
Quelle agence des Nations Unies a été impliquée?
Groupe de la Banque mondiale
Veuillez détailler The initiative is implemented under the project Public Procurement Reform Project II supported by World Bank.

Question 6: Supporting documentation

Seriez-vous en mesure de fournir des pièces justificatives pour votre initiative ? Oui

Question 7: Prix de l'UNPSA

Est-ce que l’initiative a déjà gagné un prix UN PSA ? Non

Question 8: Autres récompenses

Est-ce que l’initiative a gagné d’autres prix dans le domaine des services publics ? Non

Question 9: Comment avez-vous connu le PSPONU?

Comment avez-vous connu le PSPONU? Through Internet

Question 10: Consentement de validation

J'autorise à contacter les personnes et les entités concernées pour s'enquérir de l'initiative à des fins de validation. Non

Question 1: À propos de l'initiative

Est-ce une initiative du secteur public ? Oui

Question 2: Catégories

L'initiative est-elle pertinente pour l'une des catégories de l'UNPSA? Making institutions inclusive and ensuring participation in decision-making
UNPSACriteria
2017.2.1 Introduces an idea, policy, practice or structure that is distinctively new, innovative and unique in the context of a given country or region Enhance the formal and informal participation of all individuals and groups in public decision-making processes or policies, approaches and measures related to public services and other aspects impacting on their lives. Institutionalize and/or strengthen participatory decision-making and consultation processes at the national and local level
2017.2.4 Promulgates new or strengthens existing legislation, policy, regulation or measure to fight discrimination, exclusion and exploitation, and to extend access to public services and developmental opportunities, assets and resources for all, including women and girls, and the poorest and most vulnerable.
2017.2.5 Promotes the application of the existing legal and regulatory framework relevant to anti-discrimination and inclusion, or develop additional laws and regulations that foster changes in norms, attitudes and behavior that combat discrimination, including through promoting diversity, dialogue, interaction and collaboration.
2017.2.8 Institutes, nationally and/or locally, multi-stakeholder engagement processes.
2017.2.9 Enhances responsiveness of government to the demands and needs of citizens and ensures the inclusion of the views of concerned sections of the community in public affairs.

Question 3: Objectifs de développement durable

L’initiative est-elle pertinante pour l’une des 17 ODD ? Oui
Si vous avez répondu oui ci-dessus, veuillez préciser quel ODD est la plus pertinente pour l'initiative.
12 Consommation et production responsables
A quel(s) objectif(s), parmi les ODD mentionnés ci-dessus, correspond(ent) l’initiative ?
12.7 Promouvoir des pratiques durables dans le cadre de la passation des marchés publics, conformément aux politiques et priorités nationales

Question 4: Date de mise en œuvre

L’initiative a-t-elle été mise en oeuvre depuis deux ans ou plus ? Oui
Veuillez préciser la date de la mise en oeuvre 23 août 2011

Question 5: Partenaires

Est-ce que les Nations Unies ou toute autre organisation des Nations Unies a été impliquée à cette initiative? Oui
Quelle agence des Nations Unies a été impliquée?
Groupe de la Banque mondiale
Veuillez détailler The initiative is implemented under the project Public Procurement Reform Project II supported by World Bank.

Question 6: Supporting documentation

Seriez-vous en mesure de fournir des pièces justificatives pour votre initiative ? Oui

Question 7: Prix de l'UNPSA

Est-ce que l’initiative a déjà gagné un prix UN PSA ? Non

Question 8: Autres récompenses

Est-ce que l’initiative a gagné d’autres prix dans le domaine des services publics ? Non

Question 9: Comment avez-vous connu le PSPONU?

Comment avez-vous connu le PSPONU? Through Internet

Question 10: Consentement de validation

J'autorise à contacter les personnes et les entités concernées pour s'enquérir de l'initiative à des fins de validation. Non

Question 1: À propos de l'initiative

Est-ce une initiative du secteur public ? Oui

Question 2: Catégories

L'initiative est-elle pertinente pour l'une des catégories de l'UNPSA? Making institutions inclusive and ensuring participation in decision-making
UNPSACriteria
2017.2.1 Introduces an idea, policy, practice or structure that is distinctively new, innovative and unique in the context of a given country or region Enhance the formal and informal participation of all individuals and groups in public decision-making processes or policies, approaches and measures related to public services and other aspects impacting on their lives. Institutionalize and/or strengthen participatory decision-making and consultation processes at the national and local level
2017.2.4 Promulgates new or strengthens existing legislation, policy, regulation or measure to fight discrimination, exclusion and exploitation, and to extend access to public services and developmental opportunities, assets and resources for all, including women and girls, and the poorest and most vulnerable.
2017.2.5 Promotes the application of the existing legal and regulatory framework relevant to anti-discrimination and inclusion, or develop additional laws and regulations that foster changes in norms, attitudes and behavior that combat discrimination, including through promoting diversity, dialogue, interaction and collaboration.
2017.2.8 Institutes, nationally and/or locally, multi-stakeholder engagement processes.
2017.2.9 Enhances responsiveness of government to the demands and needs of citizens and ensures the inclusion of the views of concerned sections of the community in public affairs.

Question 3: Implementation Date

L’initiative a-t-elle été mise en oeuvre depuis deux ans ou plus ? Oui
Veuillez préciser la date de la mise en oeuvre 23 août 2011

Question 4: Partners/Stakeholders

Est-ce que les Nations Unies ou toute autre organisation des Nations Unies a été impliquée à cette initiative? Oui
Quelle agence des Nations Unies a été impliquée?
Groupe de la Banque mondiale
Veuillez détailler The initiative is implemented under the project Public Procurement Reform Project II supported by World Bank.

Question 5: Required Supplemental Documents

Seriez-vous en mesure de fournir des pièces justificatives pour votre initiative ? Oui

Question 6: UNPSA Awards

Est-ce que l’initiative a déjà gagné un prix UN PSA ? Non

Question 7: Other Awards

Has the initiative won other Public Service Awards? No

Question 8: Sustainable Development Goals

L’initiative est-elle pertinante pour l’une des 17 ODD ? Oui
Si vous avez répondu oui ci-dessus, veuillez préciser quel ODD est la plus pertinente pour l'initiative.
12 Consommation et production responsables
A quel(s) objectif(s), parmi les ODD mentionnés ci-dessus, correspond(ent) l’initiative ?
12.7 Promouvoir des pratiques durables dans le cadre de la passation des marchés publics, conformément aux politiques et priorités nationales

Question 9: Validation Consent

Avez-vous des objections à ce que nous enquêtions sur votre initiative afin de pouvoir la valider ? Non

How did you know about UNPSA?

How did you know about UNPSA? Through Internet

Nomination form

Questions/Answers

Question 1

Veuillez faire une brève description de l’initiative, en incluant les problèmes et défis abordés et les solutions apportées par l’initiative (300 mots maximum)
To ensure transparency, accountability, equal opportunity and fair competition in public procurement a series of reforms were initiated by government of Bangladesh in 2002 followed by recommendations made in the study carried out jointly by GoB, World Bank and Asian Development Bank in 2001. Based on the recommendations the Public Procurement Reform Project (PPRP) supported by WB was taken up that continued up to 2007. Under that project, a unified legal framework was prepared, regulatory institution Central Procurement Technical Unit (CPTU) was established and capacity building started. To digitize public procurement for greater efficiency, openness and participation a provision for electronic procurement system was incorporated in the Public Procurement Act 2006 which was operaionalised in 2008 under the PPRP-II supported by WB.In compliance with the act, electronic government (e-GP) system was introduced in 2011 under the e-GP Guidelines. The Prime Minister opened the e-GP portal on June 2, 2011. The tender through the e-GP portal started on August 23, 2011. The electronic procurement system was embraced by major stakeholders like procuring entities and tenderers. Until December 10, 2017, a total of 132 thousand tenders worth of USD145 million were invited through e-GP system. The implementation of e-GP in public procurement of Bangladesh that spends almost 80 per cent of its Annual Development Program and 24 per cent of National Budget is a revolutionary achievement. It is saving time and cost, ensuring participation of all and fairness in spending public money. The rate of competition has increased to over 10 per tender which was only 4 before it was in place. Starting from the planning up to contract management is now done through e-GP. The procurement performance is also measured through the system.The system comprised with all steps from procurement plan to contract management.
a. Quels sont les objectifs principaux de l’initiative?
Veuillez décrire les objectifs principaux de l’initiative (200 mots maximum)
The overall objective of the initiative is to fully digitize public procurement in Bangladesh to remove all physical hassles, ensure efficiency and enhance transparency, accountability and fair competition in the process for achieving value for money. Ensuring efficiency, effectiveness, economy and equity is the essence of public procurement. Implementation of electronic government procurement is an initiative that will contribute significantly in reducing time and cost as well as good governance in spending public money. The measurement of procurement performance is also an objective that will give a comprehensive scenario of compliance with the act and rules to establish best practices in public procurement in Bangladesh.
b. Comment l’initiative s’intègre-t-elle dans la catégorie sélectionnée?
Veuillez décrire comment l’initiative est liée aux critères de la catégorie (200 mots maximum)
The initiative of e-GP is linked to Category 2 that involves the process of the inclusion of the stakeholders in public procurement. Also, in the decision-making, all stakeholders are given space and their voices are heard throughout the process of consultation on public procurement and e-GP. The initiative exclusively is dedicated to making institutions inclusive. Citizen can have relevant information from the e-GP website. Through this unique e-procurement system all stakeholders like tenderers, procuring entities, financial institutions, development partners, media and civil society are included in line with their respective roles in ensuring openness and transparency.

Question 2

L’initiative doit viser à améliorer la vie des personnes, notamment en améliorant la contribution des services publics à la mise en œuvre du Programme de développement durable à l'horizon 2030 et à la réalisation des Objectifs de développement durable (ODD).
Veuillez expliquer comment l’initiative améliore la prestation du service public (200 mots maximum)
The delivery of public services has improved. Transaction time is reduced. Competition increased. About 99 per cent tenders are awarded during the initial validity period. Tenderers need not move to public offices for their tender submission or payments. They can do it online at home. All physical obstructions to submission have been removed. Through public opening online all contenders can see directly their position. There is no scope to hide any information. For increased participation, quality of procurement has also increased. Therefore, economy has increased.

Question 3

L’initiative doit avoir un impact positif sur un ou plusieurs groupes de personnes (par exemple d’enfants, de femmes, de personnes âgées, de personnes à mobilité réduite, etc.) et aborder un problème important de prestation de services publics dans le contexte d’un pays ou d’une région donnée.
a. Veuillez expliquer comment l'initiative a résolu un problème important lié à la prestation des services publics (200 mots maximum)
The significant issue of misuse of public funds has been addressed. Due to enhanced quality and reduction in time common people across country, particularly the marginalized segment of population is largely benefited. They are getting more road and communication facilities for business and selling their agricultural produces. It has created a very positive impact on the sectors like health, education, power, rural infrastructures, energy etc.
b. Veuillez expliquer comment l'initiative a eu un impact positif sur un ou plusieurs groupes de la population dans le contexte de votre pays ou région (200 mots maximum)
A large group of tenderers, about 40 thousand registered out of about 150 thousand, and also the procuring entities are directly benefited. The benefits of the e-GP system are ultimately creating a very positive impact on the lives of both rural and urban population. Civil society and media are also benefited. At present, monitoring of public procurement by them is done on a small scale and they are also going to start monitoring implementation on a large-scale soon.

Question 4

L’initiative doit présenter une idée innovante, une approche définitivement nouvelle ou encore une politique unique ou une approche de mise en œuvre afin d’atteindre les Objectifs de développement durable dans le contexte d’un pays ou d’une région donnée.
a. Veuillez expliquer de quelle manière l’initiative est innovante dans le contexte de votre pays ou région (200 mots maximum)
Transformation of manual traditional public procurement system into ICT based digital technology where registration of tenderers, procuring entities, banks and Development Partners are done on a single portal. Also performance of procurement is measured through the online system. In line with the SDGs target (12.7) public procurement is being made sustainable through the implementation of e-GP that comprises planning, contract management and performance measurement.

Question 4b

b. Veuillez décrire si l’initiative est inédite ou si elle est une adaptation d’une même initiative dans un autre contexte (si vous savez lequel) (200 mots maximum)
The e-GP innovation in Bangladesh is exclusively original and rooted to the country system. This is a centralized portal with decentralized operation procedures. The central portal is located at CPTU and all procuring entities can process their tenders in a decentralized way. Legal compliance are ensured on-line and the system is accepted by all the communities as enable reaping sustainable public procurement with good governance.

Question 4c

c. Quelles ressources (par exemple, financières, humaines, matérielles ou d’autres ressources) ont été utilisés pour la mise en œuvre de l’initiative ? (200 mots maximum)
A state-of-the-art national-level wider capacity data center with all security and safety options, e-GP experts, procurement experts, e-GP/Procurement trainers and training firm, operation and maintenance firm for application of the system, the central portal (www.cptu.gov.bd) are used to implement the initiative.

Question 5

L’initiative doit pouvoir s’adapter à d’autres contextes (par exemple à d’autres villes, pays ou régions). Peut-il déjà être prouvé qu’elle a inspiré des innovations similaires dans d’autres institutions du secteur public dans un pays donné, une région, ou au niveau mondial?
L’initiative a-t-elle été transférées dans d’autres contextes?
Oui
The e-GP system has drawn appreciation in South Asia and beyond. Countries like Bhutan, Nepal, Afghanistan, Sri Lanka, Zambia have visited the system and they are willing to implement it in their countries for digitizing public procurement. In the Global Development Learning Network the system is being discussed through video conferencing every month and knowledge is being shared with other countries. Various features of the e-GP system are annually shared with The South Asia Public Procurement Network (SAPPN). The innovation in Bangladesh has encouraged other countries and Bhutan has already started implementing it in their public procurement.The e-GP of Bangladesh is also shared with other countries similar initiatives in different Global conference, conference organized by world Bank/ADB and others

Question 6

L’initiative doit pouvoir durer sur une longue période de temps.
a. Veuillez décrire si l’initiative est durable et comment (couvrant les aspects sociaux, économiques et environnementaux) (300 mots maximum)
The initiative is sustainable because it has its own earnings. Environment is protected as it does not require to prepare paper. Social and economic aspects are also maintained as small enterprises are also getting the benefits of participation. Earlier they used to face obstructions from the influential groups. Now through online there is no scope for obstruction. Therefore, it has grown as an institution. The e-GP system's earnings have stood at USD 26 billion from the sale of e-documents, registration etc. Government has initiated to institutionalize the e-GP by creating a public owned company which will be running on its own income.
b. Veuillez décrire si et comment l’initiative peut durer dans le temps (300 mots maximum)
The e-GP system is expected to be sustainable much before the SDG deadline. Full digitization with all required capacity building and compliance will be done by 2022. A plan to corporatize e-GP to establish as a self-sustainable system has been taken up under a new project Digitizing Implementation Monitoring and Public Procurement with World Bank support.

Question 7

L’initiative doit avoir fait l’objet d’une évaluation formelle, montrant des évidences de son impact sur l’amélioration de la vie des personnes.
a. L’initiative a-t-elle fait l’objet d’une évaluation formelle ?
Oui
Si oui, veuillez décrire comment l’initiative a-t-elle été évaluée (200 mots maximum)
The e-GP initiative impact was evaluated formally through a set of consultations and interactions with the stakeholders. They are tenderers, procuring entities, financial institutions etc. A consulting firm was engaged to evaluate the evaluation of e-GP implementation during the project PPRPII ended on 2017 .
b. Veuillez décrire le résultat de l'évaluation de l'impact de l'initiative (200 mots maximum)
The outcome of the evaluation has presented a very positive change through the implementation of the e-GP system. Reduction of procurement delays (83 per cent of contracts award within initial bid validity period in 2016 against only 10 per cent in 2007. Web publication of bid invitations enhanced to 100 per cent in 2016 from 70 per cent in 2016. Insignificant number of complaints in e-GP in 2016--less than 1 per cent against substantial number of complaints in traditional tendering during 2010
c. Veuillez décrire les indicateurs utilisés (200 mots maximum)
A mixed set of indicators were used to evaluate the impact that include among others average number of tenderers purchasing tenders, average number of tenderers submitting tenders, average number of responsive tenders, average number of days between final approval and Notification of Awards. percentage of contracts within scheduled time etc.

Question 8

L’initiative doit démontrer qu’elle a impliqué divers intervenants, notamment d’institutions, de la société civile ou du secteur privé, lorsque c’était possible.
L’agenda 2030 pour le développement durable met l’accent sur la collaboration, l’engagement, la coordination, le partenariat et l’inclusion. Veuillez décrire comment les parties prenantes ont été impliquées dans la conception, la mise en œuvre et l’évaluation de l’initiative. Veuillez refléter leurs rôles et contributions (300 mots maximum)
The e-GP system is implemented by the government of Bangladesh through the nodal office for public procurement ,CPTU. A wider consultation and engagement of of government procuring agencies, procuring entities, private sectors( Contractors, suppliers, consultants), business associations, banks/financial institutions, civil society and media were ensured in the process of e-GP introduction in Bangladesh. Collaboration with development partners and inclusion of all relevant stakeholders have been ensured in the conduct of e-GP. Starting from the preparation of e-GP guidelines up to its implementation the role of policymakers, procuring entities, development partners, private sector, civil society and media were thoroughly discussed and tapped. The private business community has their role as implementer of the government projects. Civil society has oversight role and media plays the role of procurement watch-dog. Development partners have the role of suggesting harmonization of the system with global practices. Sharing/consultation are being continued during changing or introducing any provision/policy that effect procuring system in Bangladesh time to time.

Question 9

Veuillez décrire les leçons clés apprises ainsi que toutes les idées que vous avez quant à l’amélioration de l’initiative (200 mots maximum)
It has opened the door for the private sector to do business with the government and computer literacy has also increased in the country. The initiative has improved efficiency, enhanced transparency, increased competition, minimized collusion, increased professionalization and capacity building. The e-GP system can be further simplified and more innovations can be added to make it more user-friendly. Dialogues and consultations are planned under new project to do all such activities to make the e-GP a success.