Questions/Answers
题 1
请简要描述项目所解决的问题或挑战,并具体说明其目标。(最多300字)
The Development Agenda, Agenda for jobs: Creating Prosperity and Equal Opportunity for all, the framework for development planning in Ghana has five thematic areas which among others emphasis Social Development, Economic Development, Environment, Infrastructure and Human Settlement and Governance, Corruption and Public Accountability. The construction of a 20 Bed Capacity Isolation Centre and revenue Mobilization is in line with the Agenda for Jobs objective to develop an effective drainage system.
Established in March 2019, as an off shoot from Accra Metropolitan Assembly with zero revenue base, the Municipal Assembly was able to mobilize an amount of Five Million, Three Hundred and Thirty-Seven Thousand, Three Hundred and Eighty-Two Ghana cedis and Fifty-Four Pesewas (GH₵ 5,337,382.54) out of a budgeted figure of Five Million, Thirty-Six Thousand, Seven Hundred Ghana cedis (GH₵ 5,036,700.00). This represents 105.97 per cent performance rate.
In2020 fiscal year, the Municipal Assembly leapfrog the revenue performance by significantly mobilizing Nine Million, Five Hundred and Twenty Thousand, Five Hundred and Ninety Ghana cedis and Eighty-Eighty Pesewas (GH₵ 9,590,590.88) out of a budgeted figure of Nine Million, Eight Hundred and Eleven Thousand Ghana cedis (GH₵ 9,811,000.00). This represents an unprecedented a year-on-year growth of 79.69 per cent. One can only attribute these significant gains to visionary and decisive leadership. The above narrative boosted the financial resilience of the institution towards Covid-19 pandemic.This significantly impacted positively in the provision of quality services to the constituents. For instance, Korle Klottey Municipal Assembly was the only local authority in Ghana that constructed a Covid-19 Isolation center using its Internally Generated Funds (IGF) in order to build the infrastructure resilience of the institution towards Covid-19 pandemic.
The use of electronic platform for collection which limits human interface with its attendant consequences, outsourcing hard to collect areas to sub-structures, target settings for revenue collectors, frequent capacity building and refresher trainings for revenue collectors, re-valuation of properties, aligning special service delivery with rate payment, monitoring and update of field revenue data base (data collection)
题 2
请解释该项目如何与所选类别相关联。(最多100字)
The Local Governance Act, 2016, ACT 936 and the Public Financial Management Act, 2016, ACT 921 mandates local authorities to mobilize local resources for the holistic development of the municipality. These resources are appropriated to provide essential social services to the population of the municipality.Hence the mobilization of resources and its appropriation to construct and furnish a heath facility as well as ensuring the availability of water for hand-washing and other hygiene purposes during the COVID-19 pandemic are linked to category IV (special Category on institutional resilience and innovative responses to the COVID-19 Pandemic) of the UNPS Awards.
题 3
a. 请具体说明该项目支持哪个/些可持续发展目标和具体目标,并详细说明该项目如何为这些目标的实施做出了贡献。(最多200字)
The effective mobilization of local taxes and its appropriation to construct and furnish a facility during the COVID-19 pandemic are linked to SDGs 3 and 6.
SDG 3: Ensure healthy lives and promote well-being for all at all ages
Target: 3.8 Achieve universal health coverage, including financial risk protection, access to quality essential health-care services and access to safe, effective, quality and affordable essential medicines and vaccines for all.
Contribution of initiative to the implementation of SDGs : The construction and furnishing of the 20-bed capacity gender friendly COVID-19 Isolation Centre increased access to health-care services, affordable essential medicines, and vaccines for reported infected population.
SDG 6: Ensure availability and sustainable management of water and sanitation for all
Targets: 6.1 By 2030, achieve universal and equitable access to safe and affordable drinking water for all.
6.2 By 2030, achieve access to adequate and equitable sanitation and hygiene for all and end open defecation, paying special attention to the needs of women and girls and those in vulnerable situations.
Contribution of initiative to the implementation of SDGs: As part of the physical hospital structure, receptables were provided to ensure clean water was availability for hand -washing and other hygiene purposes. Provision was also made within the health facility the management of solid, liquid, and hazardous wastes.
b. 请描述一下该项目如何在社会、经济和环境方面具有可持续性。(最多100字)
Socially, the initiative will be transforming the lives of the people living in the municipality. this include formal and informal workers, traders and other auxiliary workers.This is based on improvement in health infrastructure and innovation to build a resilient city.
economically, active labour force will contribute in organizing effective local economy within the city.
Environmentally, the initiatives aim at addressing flooding issues through landscaping and effective sanitation management within the municipality.
题 4
a. 请解释该项目如何解决特定国家或地区范围内的政府管理、公共行政或公共服务方面的重大缺失。 (最多200字)
The health care needs of the people of Korle Klottey have had pressure just all other facilities in the country. This is because the Municipality serves as a recipient of all travellers to the capital city, thus putting pressure on the available facilities.
The Development Agenda, Agenda for jobs: Creating Prosperity and Equal Opportunity for all, the framework for development planning in Ghana has five thematic areas which among others emphasise Social Development, Economic Development, Environment, Infrastructure and Human Settlemnet and Governance, Corruption and Public Accountability. The construction of a 20 Bed Capacity Isolation Centre and revenue Mobilization is in line with the Agenda for Jobs objective to develop an effective drainage system. The proposed initiative project is in the Medium Term Development Plan of the Municipality as well as the Annual Action Plan, the Annual Budget Estimates and the Procurement Plan for 2020.
The project was identified as a felt need during the public hearings organised in the preparation of the plan. The women and the entire community identified it as a critical need which had to be met by the Assembly. Again, it is a project whose service is already in demand as it is an existing health facility.
b. 请描述该项目如何解决国家背景下的性别不平等问题。 (最多100字)
The initiative addresses gender inequality by not living no one behind. Experience in countries such as India, Thailand, Namibia and South Africa and our own experience with the Ghana development Planning process indicates the bottom up approach with broad based participation of all stakeholders, by design and in practice) have encouraged women to take on central roles in community development processes – initially through savings and as a result in planning and managing development schemes. Women make up between 50-65% of all development engagement in Ghana and make up a majority of the leadership in all of the countries mentioned above.
c. 请描述该项目的目标群体是谁,并解释该项目给目标群体带来的改善成果。 (最多200字)
The target group was people in the Municipality especially women, aged and low income groups through provision of quality-oriented, service delivery. The initiative has improved the following outcomes:
• Increased ability to shape urban planning, policy, legal, and regulatory environment
• Reduced risks or enhanced ability to cope with risks: associated with natural disasters/climate change, illness or accidents, deaths in the family, or other factors
• Enhanced Better services and infrastructure, including shelter, water and sanitation
题 5
a. 请描述该项目是如何实施的,包括关键发展和步骤、监测、评估活动以及年表。 (300字)
The initiative, was implemented by the Korle Klottey Municipal Assembly (KoKMA) after all tendering processes were completed. It was supervised by the Municipal Works Department and monitored by the Municipal Planning and Coordinating Unit. There were regular site meetings between the Engineers and the contractor. Two monitoring made up of health directorate team, Traditional Authorities, youth groups, women groups, Assembly member of the area, Unit Committees members among others. Comments and views were discussed and actions were followed up in our subsequence monitoring to see how it has shape the initiative.
Ex-ante evaluation was done by project team to appraise the initiative, field visit including questionnaire were used to solicit information to answer question posed by the team. The result revealed that land cost should not be added because existing facility had space for the new facility. Electricity Company of Ghana was to be contacted to facilitate relocation of light pole.
b. 请清楚地解释所遇到的障碍以及这些障碍是如何被克服的。(100字)
major obstacle was getting material to site due to the lockdown, shorter period of the delivery of project put much stress on the worker and the supervisor, difficulty in getting certification from the Public Procurement Authority.
To overcome the above contractor had to convince other project contractor to use their materials; extra cost was incurred to provide workers and supervisors a place to sleep to finish the project on time. The Municipal Chief Executive had to call the PPA director to arrange for emergence meeting to the approval.
题 6
a. 请说明在您所在国家或地区,该项目在哪些方面具有创新性。(最多100字)
The municipality is located at the heart of the Central Business District of the national capital (Accra) with a high concentration of businesses and population density. The initiative was implemented when restrictions were imposed on movement of persons and goods (lockdown) and there was the need to offer specialised service and care to the population to save lives. Among the total municipalities in the country, the Korle Klottey was the first to mobilise the neded resource to support the speedy construction, furnishing and operationalisation of the COVID-19 Isolation Centre.
b. 如果相关,请描述该项目是如何从其它国家和地区的成功项目中获得灵感的。(最多100字)
As a result of this initiative the nation has included its annual budget to construct One Hundred and One hospitals ‘christened Agenda 101’ countrywide. This government policy on increasing access to healthcare was to be implemented in selected municipal and District Assemblies.
c. 如果使用新兴技术和前沿技术,请说明这些技术如何整合在倡议中以及如何包含数字政府。 (限制100个字)
Korle Klottey Municipal Assembly was able to perform this initiative due to the introduction of the improved digital system of generating bills, tracking and collection of imposed local taxes and levies using the point-of-sale devices.
题 7
a. 根据您的组织信息,该项目有没有转接或适用到其它情况(例如,其它城市、国家、或者地区)?如果有,请说明在哪里以及是如何进行的。(最多200字)
The Greater Accra Regional Minister who commissioned the project expressed appreciation of the project and tasked the remaining twenty-eight (28) local authorities in region to develop a robust system of response to emergencies such as the COVID-19 Isolation Centre. This was carried in the print media radio station in the reviews. The Municipality has shared all the process to other municipalities who wants to undertake the same steps. The municipality is also trying to equip it sub-structures take advantage of the digitalisation to rope in adequate revenue for development.
b. 如果尚未转移/适用到其它情况,请描述其转移的可能性。(最多200字
N/A
题 8
a.使用了哪些具体资源(例如财务、人力或其他资源)来实施该项目? (最多100字)
The Assembly supported the building of capacity of Revenue Collectors in Information Technology in their desire to own their messages, convert our aspirations to vision, conduct rapid profiling and mapping and improve the collection, and otherwise increase their chances of informing a transformational process also a Multi-Skills Project Team which ensured that related activities were delivered.
Of the total revenue mobilized from internally generated sources, an amount of GHC342,169.99 (US$56,659.62) was dedicated to the construction and furnishing of the health, water and hand washing facility.
b. 请从财务和机构角度来解释,是什么确保该项目的长期可持续性?(最多100字)
In terms of local level financial sustainability, Internally Generated fund was set aside to support operations and maintenance of the project. Funds helped to deal with vulnerability on a day-to-day basis, laying a foundation for sustaining a whole other range of individual and community activities. Finally, documenting the experiences and sharing those ideas both amongst the MMDA’s and with appropriate policy-makers, helped to ensure sustainability by promoting the principles that emerge.
In terms of institutional terms the health facility has been handed over to the Health Directorate upon its completion and installment of equipment for use. The assignment of requisite Staff to manage the facility is the primary roles of the Health Directorate.
题 9
a. 该项目是在内部还是外部正式评估的?
是
b. 请描述一下评估是如何进行的以及由谁评估的。 (最多100字)
By Internal Evaluation
The Medium Term Dev’t. Plan (MTDP 2018-2021) of the Assembly in its third year of implementation required a Mid-Term Review. The overall purpose of the Review was to provide management and stakeholders with an assessment of the performance and outputs of the Project towards achieving the Project Development Objectives.
A three-member team was appointed by management of Korle Klottey Municipal Assembly to Review the MTDP (Mid-Term) between 13th March and May 20, 2021. The Team consulted with all stakeholders and beneficiaries of the Isolation Centre. The team also reviewed project documents (Annual Reports).
c. 请描述使用的指标和工具。(最多100字)
The evaluation was guided by indicators such as percentage of IGF committed to project, environmental safeguards issue, number of beneficiaries, availability of medical services among others.
The approach of the Review is factual and is inclusive and participatory. Hard data on implementation, progress and impacts were collected, analyzed and presented. At the same time, the evaluation analysis considered the perspectives and viewpoints of all relevant stakeholders (both internal and external). This implies that the span of methodological tools applied included basic hard data collection and analysis interviews, group discussions and observations.
d. 评估的主要发现是什么(例如,该项目筹集的资源充足、实施质量和面临的挑战、主要成果、倡议的可持续性,影响力等)以及如何利用这些信息为该项目的实施提供资讯 。(最多200字)
The main findings of the evaluation indicate that resource was adequate for the project; quality work was done to the admiration of the Hon. Regional Minister, the staff of the facility and other stakeholders. The project was completed on schedule. Disbursement was initially slow, delay in acquisition of Environmental Protection Agency (EPA) permit. Environmental and social safeguards recommendations were not fully included in bidding documents for prospective contractors to price. Outcomes were not explicitly stated in the project Result Frame Matrix. The above information was used to determine whether the project initiative had value for money and reshape future project design.
题 10
请描述该项目如何被列入相关的制度环境(例如,它与相关政府机构的关系如何,以及与已运行机构的关系如何)。 (最多200字)
The Nation’s Local Governance Act, 2016, ACT 963 and the Public Financial Management Act, 2016, ACT 921 mandates Local Authorities to mobilise resources to promote human and physical development. To this end, the Municipal Assembly has the legal mandate to appropriate its resources to resolve developmental challenges or gaps. The decentralized system of governance established departments of the Assembly of which Health is one. The Health Department being responsible for the management of public health facilities, its services both preventive and curative as well as the personnel collaborates with the Municipal Assembly and other agencies to ensure increase coverage of the population.
The construction and furnishing of the 20-Bed Capacity COVID-19 Isolation Centre was a response to physical infrastructure deficit in the municipality during the outbreak of the pandemic. It presented the opportunity for testing, screening and vaccination whiles also providing for the infected population within the catchment area to be quarantined to receive the requisite treatment.
题 11
2030年可持续发展议程强调协作、参与、合作关系和包容性。请描述哪些利益相关方参与设计、实施和评估计划以及这些参与是如何实现的。 (最多200字)
The Municipal Assembly’s responsibility is to provide infrastructure to support delivery of municipal services. In the implementation of interventions, it identifies and engages all stakeholders in the project management cycle. These are officials from the Ghana Health Service, Civil Engineers- Quantity Surveyor; Architect, Environmental Protection Agency, Public Health, Environmental Safety and Sanitation Officers and Revenue Collectors.
1.Stakeholder: Municipal Assembly (Classification: Primary)
Responsibility: Revenue mobilization, Project design, implantation, monitoring and evaluation
Involvement in designing, implementation and evaluation: compilation of Revenue Improvement Action Plan (RIAP)
The adoption and deployment of electronic revenue mobilization devises led to significant improvement in revenue mobilized. This provided resources to support the expansion of health facilities.
To ensure that the structural design conforms to acceptable health and safety standards, the relevant public sector officers (Estates Officers) assisted the Civil Engineers to design the structure to reduce reinfection within the facility and also ensuring smooth work flow.
2.Stakeholder: Ghana Health Service (Classification: Primary)
Responsibility: Healthcare delivery (Service)
Involvement in designing, implementation and evaluation: Compliance and inspection of project design.
To ensure that the structural design conforms to acceptable health and safety standards, the relevant public sector officers (Estates Officers) assisted the Civil Engineers to design the structure to reduce reinfection within the facility and also ensuring smooth work flow.
3.Stakeholder: Environment Protection Agency (Classification: Primary)
Responsibility: Ensuring compliance to national health and safety standards
Involvement in designing, implementation and evaluation: Environmental Impact Assessment was conducted by the Environmental Protection Agency and and Sanitation Officers
Identification and integrating of mitigation measures during the project design Meetings.
题 12
请描述主要经验,以及贵组织计划如何改进该项目。(最多200字)
The intervention was implemented under a health emergency (COVID-19).
Difficulty in mobilizing building materials to site under the restriction of movements of persons and goods.
Safeguards issues were difficult to control as the facility was constructed within the premises of an existing medical facility.
The project output was achieved and is currently in use.
Our organization, intends to use lessons learnt to improve upon project planning and designing by advocacy and influencing policy and mobilizing resources to execute future development infrastructure effectively, efficiently and in a sustainable manner for the people.