Dubai Electricity and Water Authority (DEWA) substation is a standard 132-kilo volt/ 11 kilo volt substation consists of 132KV Gas insulated switchgear of 8 feeders and 3 No.s of transformer. Gas insulated switchgear are filled with SF6 (Sulphur Hexa fluoride) gas. 132KV cables are connected to transfer power from Gas insulated switchgear (GIS) to transformer.
In order to test 132KV cables, DEWA followed the standard recognized 25 years practice of performing the cable High voltage test (To check the healthiness of cable) between Gas Insulated Switchgear and transformer by mounting test adaptor device on each bay independently ( total 3 times since 3 number of bays) which involves 428 KG’s of SF6 gas works per substation.
The main objective was to reduce the environmental impact to reduce the usage of SF6 gas with present practice. Action for improvement were prepared for the pilot project. Team members assigned with responsibilities. Team studied in details of different option of pros and cons of new methods to reduce the usage of SF6 gas.
Specific objectives: Sustainable initiative (To reduce environmental impact by reducing the usage of SF6 gas works by 85%). 2. cost saving. 3. Happy society and Happy stakeholders.
题 2
请解释该项目如何与所选类别相关联。(最多100字)
The innovation of enhanced design and testing method of high voltage test resulted in optimized usage of SF6 gas work, which saves the environment (avoids SF6 gas emission to ozone) is the key element change from the previous method.
The innovative method is a breakthrough and first kind of new methodology of testing in GCC, which is contributing to sustainability. Team plan to conduct Benchmarking studies with other utilities to utilize this method.
Overall industry level, due to 85%consumption of SF6 gas reduced, the production of SF6 gas will be reduced in the industry and its remarkable breakthrough in contribution to sustainable goals on climate action and responsible consumption and production.
题 3
a. 请具体说明该项目支持哪个/些可持续发展目标和具体目标,并详细说明该项目如何为这些目标的实施做出了贡献。(最多200字)
SDGs- Responsible consumption and Production
Team formed under the theme sustainability to develop the innovative method on testing of High Voltage cables in 132-kilo volt DEWA substation. The team main objective was to reduce the environmental impact to reduce the usage of SF6 gas with present practice. In addition to main objectives, team also focus in cost saving, optimize risk, happy stakeholder and happy society. Action for improvement were prepared for the pilot project. Team members assigned with responsibilities. Team studied in details of different option of pros and cons of new methods to reduce the usage of SF6 gas.
Team Suggested combining all bays cable High Voltage test together by mounting test adaptor device on common place in switchgear instead of 3 times from each bay independently which simplify the process and reduced the usage of 85% SF6 gas works. Detailed study conducted by team on new testing method with each manufacturer.
Feedback and confirmation obtained from all stakeholders to implement the project (sustainable solution) for all ongoing and future (200 No. s of substation). Challenges like technical vulnerability, original manufacturer confirmation on newly proposed method were overcome. Team initially plan to implement the project for 10 numbers of selected on-going substation, which was successfully tested and completed.
Accordingly, as per the project master plan, team implemented the suggestion and executed in running projects after getting concurrence from concerned stakeholders
b. 请描述一下该项目如何在社会、经济和环境方面具有可持续性。(最多100字)
Usage of SF6 gas works reduced by 85% (4280 Kg's of SF6 gas works reduced per 10 Substation equals to 97,584 tonnes of Co2 avoided).
2. Green Environment (21,400 cars emission avoided in Dubai city for a whole year)
3. Cost saving of USD 3.26 million per 10 numbers of Substation.
4. Happy stakeholders (Resources, cost, time saved (328 man-days saved).
Developer/customer- project work commissioned on time prior to ahead of schedule.
Society- Green environment-
Manufacturer/contractor – Work simplified, less consumables, man-days, cost and resource saving.
Dewa- Increase productivity, cost saving, resource saving, Happy stakeholders
5. Happy society (21,400 cars emission avoided in the Dubai city for a whole year).
题 4
a. 请解释该项目如何解决特定国家或地区范围内的政府管理、公共行政或公共服务方面的重大缺失。 (最多200字)
DEWA has pledged As a public service Goverment enterprise, DEWA has taken initiative in reduction of environmental usage in core business activity.
This project is a breakthrough and first kind of new innovative testing methodology globally on testing of high voltage cables, which is contributing to environment.
This project contributed to global sustainable development goals of responsible consumption and production, climate action under the sustainability pillar “Environmental”.
contribution to UN SDGs goal.
b. 请描述该项目如何解决国家背景下的性别不平等问题。 (最多100字)
DEWA and its initiative always address gender equality. The team formed to study this initiative has give equal rights in gender equality
c. 请描述该项目的目标群体是谁,并解释该项目给目标群体带来的改善成果。 (最多200字)
The target group is to reduce the environmental impact.
The initiative improved outcomes of target groups as below
Usage of SF6 gas works reduced by 85% (4280 Kg's of SF6 gas works reduced per 10 Substation equals to 97,584 tonnes of Co2 avoided).
2. Green Environment (21,400 cars emission avoided in Dubai city for a whole year)
3. Cost saving of USD 3.26 million per 10 numbers of Substation.
4. Happy stakeholders (Resources, cost, time saved (328 man-days saved per 10 substation).
题 5
a. 请描述该项目是如何实施的,包括关键发展和步骤、监测、评估活动以及年表。 (300字)
Team Suggested combining all bays cable High Voltage test together by mounting test adaptor device on common place instead of 3 times which simply the process and reduced the usage of 85% SF6 gas works.
Detailed technical study conducted against each original equipment manufacturer including factory visit.Meeting were condcuted with all stakeholders in applying the high voltage through switchgear bus bars instead of applying only to cable chamber. Feedback and confirmation obtained from all stakeholders to implement the project (sustainable solution) for all ongoing and future (200 No. s of substation). Challenges like technical vulnerability, original manufacturer confirmation on newly proposed method were overcome. Team initially plan to implement the project for 10 numbers of selected on-going substation, which was successfully tested and completed.
Accordingly, as per the project master plan, team implemented the suggestion and executed in running projects after getting concurrence from concerned stakeholders.
b. 请清楚地解释所遇到的障碍以及这些障碍是如何被克服的。(100字)
• Stakeholder acceptance including OEM confirmation required-
• Suggesting an alternate method instead of proven world wide practice of 25 years
• Will it be Technically acceptable ? IEC recommended this method?
Initiated and Coordinated meeting with concerned stakeholders.
Concurrence obtained from stakeholder including OEM.Detailed technical study conducted against each original equipment manufacturer including factory visit.Meeting were conducted with all stakeholders in applying the high voltage through switchgear bus bars instead of applying only to cable chamber. Feedback and confirmation obtained from all stakeholders to implement the project (sustainable solution) for all ongoing and future (200 No. s of substation). Challenges like technical vulnerability, original manufacturer confirmation on newly proposed method were overcome. Team initially plan to implement the project for 10 numbers of selected on-going substation, which was successfully tested and completed.
Accordingly, as per the project master plan, team implemented the suggestion and executed in running projects after getting concurrence from concerned stakeholders.
题 6
a. 请说明在您所在国家或地区,该项目在哪些方面具有创新性。(最多100字)
The innovation in testing method of high voltage test resulted in optimized usage of SF6 gas work( avoids SF6 gas emission to ozone) which foucs on sustainability pillar environmental.
The innovative method is a breakthrough and first kind of new methodology of testing globally, which is contributing to sustainability.
Overall industry level, due to of consumption of SF6 gas reduced, the production of SF6 gas will be reduced in the industry and its remarkable breakthrough in contribution to sustainable goals on climate action and responsible consumption and production
b. 如果相关,请描述该项目是如何从其它国家和地区的成功项目中获得灵感的。(最多100字)
The idea and initiative transferability to other region, country since the acheivement is breakthrough and first innovative idea among globally
c. 如果使用新兴技术和前沿技术,请说明这些技术如何整合在倡议中以及如何包含数字政府。 (限制100个字)
Nil
题 7
a. 根据您的组织信息,该项目有没有转接或适用到其它情况(例如,其它城市、国家、或者地区)?如果有,请说明在哪里以及是如何进行的。(最多200字)
This idea / initiative shared with other utilities through benchmarking visit.
Other utilities also implement this idea as this method is technically recommended and proven worldwide by all stakeholders including original equipment manufacturer.
b. 如果尚未转移/适用到其它情况,请描述其转移的可能性。(最多200字)
Transferred
题 8
a.使用了哪些具体资源(例如财务、人力或其他资源)来实施该项目? (最多100字)
Human resources- 5 resources ( Senior, mid management staffs)
cost of the project- 0.3 Million AED
b. 请从财务和机构角度来解释,是什么确保该项目的长期可持续性?(最多100字)
1. Cost saving of USD 3.26 million per 10 numbers of Substation.
2. Happy stakeholders (Resources, cost, time saved (328 man-days saved).
题 9
a. 该项目是在内部还是外部正式评估的?
是
b. 请描述一下评估是如何进行的以及由谁评估的。 (最多100字)
Internal- DEWA corporate team
External- IDEAS AMERICA team
UAE idea by Dubai Quality Group
ASIAN Power award
c. 请描述使用的指标和工具。(最多100字)
sustainable prespective
Fish bone diagram
d. 评估的主要发现是什么(例如,该项目筹集的资源充足、实施质量和面临的挑战、主要成果、倡议的可持续性,影响力等)以及如何利用这些信息为该项目的实施提供资讯 。(最多200字)
Sustainable initiative
challenge faced
cost saving
题 10
请描述该项目如何被列入相关的制度环境(例如,它与相关政府机构的关系如何,以及与已运行机构的关系如何)。 (最多200字)
Nil
题 11
2030年可持续发展议程强调协作、参与、合作关系和包容性。请描述哪些利益相关方参与设计、实施和评估计划以及这些参与是如何实现的。 (最多200字)
DEWA has engaged all its strategy partnership especially OEM. Detailed technical study conducted against each original equipment manufacturer including factory visit.Meeting were condcuted with all stakeholders in applying the high voltage through switchgear bus bars instead of applying only to cable chamber. Feedback and confirmation obtained from all stakeholders to implement the project (sustainable solution) for all ongoing and future (200 No. s of substation). Challenges like technical vulnerability, original manufacturer confirmation on newly proposed method were overcome. Team initially plan to implement the project for 10 numbers of selected on-going substation, which was successfully tested and completed.
Accordingly, as per the project master plan, team implemented the suggestion and executed in running projects after getting concurrence from concerned stakeholders.
题 12
请描述主要经验,以及贵组织计划如何改进该项目。(最多200字)
Dependency on limited test adaptor with manufacturer (OEM) which affected the implementation of the new proposed solution.
Contractual issue- To make obligatory for the contractors during tendering stage.
Develop and fabricate a test adaptor device in order to suit the requirement and manage contractual issue like warranty.