Basic Info

提交前请先查看

提名人信息

机构信息

联合国成员国 印度
机构名称 District Administration, Tiruvannamalai, Tamil Nadu
公共部门机构类型 公共机构
行政层级 地方的
项目名称 A Mission for Empowerment of Tribal Bonded Laborers
项目运行年份 3
机构网站 https://tiruvannamalai.nic.in

问题一:关于此项目

这个项目属于公共部门吗?

问题二:类型

该倡议与UNPSA类别之一相关吗? 提高公共机构效率以达到可持续发展目标
UNPSACriteria
未找到任何项目

问题三:可持续发展目标

此项目是否与17个可持续发展目标中的任一个相关?
如果您在上面问题回答的“是”,请具体说明此项目与哪一个可持续发展目标最相关。
无贫穷
零饥饿
良好健康与福祉
优质教育
性别平等
清洁饮水和卫生设施
经济适用的清洁能源
体面工作和经济增长
产业、创新和基础设施
减少不平等
和平、正义与强大机构
促进目标实现的伙伴关系
此项目与以上列举的可持续发展目标中的哪些具体目标相关?
" 1.1 到2030年,在全球所有人口中消除极端贫困,极端贫困目前的衡量标准是每人每日生活费不足1.25美元 "
" 1.2 到2030年,按各国标准界定的陷入各种形式贫困的各年龄段男女和儿童至少减半 "
" 1.3 执行适合本国国情的全民社会保障制度和措施,包括最低标准,到2030年在较大程度上覆盖穷人和弱势群体 "
" 1.4 到2030年,确保所有男女,特别是穷人和弱势群体,享有平等获取经济资源的权利,享有基本服务,获得对土地和其他形式财产的所有权和控制权,继承遗产,获取自然资源、适当的新技术和包括小额信贷在内的金融服务 "
" 1.5 到2030年,增强穷人和弱势群体的抵御灾害能力,降低其遭受极端天气事件和其他经济、社会、环境冲击和灾害的概率和易受影响程度 "
" 1.a 确保从各种来源,包括通过加强发展合作充分调集资源,为发展中国家、特别是最不发达国家提供充足、可预见的手段以执行相关计划和政策,消除一切形式的贫困 "
2.1 到2030年,消除饥饿,确保所有人,特别是穷人和弱势群体,包括婴儿,全年都有安全、营养和充足的食物
" 2.2 到2030年,消除一切形式的营养不良,包括到2025年实现5岁以下儿童发育迟缓和消瘦问题相关国际目标,解决青春期少女、孕妇、哺乳期妇女和老年人的营养需求 "
" 3.8 实现全民健康保障,包括提供金融风险保护,人人享有优质的基本保健服务,人人获得安全、有效、优质和负担得起的基本药品和疫苗 "
4.1 到2030年,确保所有男女童完成免费、公平和优质的中小学教育,并取得相关和有效的学习成果
4.2 到2030年,确保所有男女童获得优质幼儿发展、看护和学前教育,为他们接受初级教育做好准备
4.4 到2030年,大幅增加掌握就业、体面工作和创业所需相关技能,包括技术性和职业性技能的青年和成年人数
4.7 到2030年,确保所有进行学习的人都掌握可持续发展所需的知识和技能,具体做法包括开展可持续发展、可持续生活方式、人权和性别平等方面的教育、弘扬和平和非暴力文化、提升全球公民意识,以及肯定文化多样性和文化对可持续发展的贡献
5.1 在全球消除对妇女和女童一切形式的歧视
5.2 消除公共和私营部门针对妇女和女童一切形式的暴力行为,包括贩卖、性剥削及其他形式的剥削
5.3 消除童婚、早婚、逼婚及割礼等一切伤害行为
5.5 确保妇女全面有效参与各级政治、经济和公共生活的决策,并享有进入以上各级决策领导层的平等机会
5.a 根据各国法律进行改革,给予妇女平等获取经济资源的权利,以及享有对土地和其他形式财产的所有权和控制权,获取金融服务、遗产和自然资源
6.1 到2030年,人人普遍和公平获得安全和负担得起的饮用水
6.2 到2030年,人人享有适当和公平的环境卫生和个人卫生,杜绝露天排便,特别注意满足妇女、女童和弱势群体在此方面的需求
6.4 到2030年,所有行业大幅提高用水效率,确保可持续取用和供应淡水,以解决缺水问题,大幅减少缺水人数
6.b 支持和加强地方社区参与改进水和环境卫生管理
7.1 到2030年,确保人人都能获得负担得起的、可靠的现代能源服务
7.2 到2030年,大幅增加可再生能源在全球能源结构中的比例
8.1 根据各国国情维持人均经济增长,特别是将最不发达国家国内生产总值年增长率至少维持在7%
8.2 通过多样化经营、技术升级和创新,包括重点发展高附加值和劳动密集型行业,实现更高水平的经济生产力
8.3 推行以发展为导向的政策,支持生产性活动、体面就业、创业精神、创造力和创新;鼓励微型和中小型企业通过获取金融服务等方式实现正规化并成长壮大
8.5 到2030年,所有男女,包括青年和残疾人实现充分和生产性就业,有体面工作,并做到同工同酬
8.6 到2020年,大幅减少未就业和未受教育或培训的青年人比例
8.7 立即采取有效措施,根除强制劳动、现代奴隶制和贩卖人口,禁止和消除最恶劣形式的童工,包括招募和利用童兵,到2025年终止一切形式的童工
8.8 保护劳工权利,推动为所有工人,包括移民工人,特别是女性移民和没有稳定工作的人创造安全和有保障的工作环境
9.3 增加小型工业和其他企业,特别是发展中国家的这些企业获得金融服务、包括负担得起的信贷的机会,将上述企业纳入价值链和市场
10.2 到2030年,增强所有人的权能,促进他们融入社会、经济和政治生活,而不论其年龄、性别、残疾与否、种族、族裔、出身、宗教信仰、经济地位或其他任何区别
16.2 制止对儿童进行虐待、剥削、贩卖以及一切形式的暴力和酷刑
16.6 在各级建立有效、负责和透明的机构
16.7 确保各级的决策反应迅速,具有包容性、参与性和代表性
17.14 加强可持续发展政策的一致性
17.17 借鉴伙伴关系的经验和筹资战略,鼓励和推动建立有效的公共、公私和民间社会伙伴关系

问题四:实施日期

这个项目是否有超过两年的历史?
请提供实施日期。 01 1月 2017

问题五:合作伙伴/利益攸关方

是否有联合国或其相关机构参与此项目?
参与项目的联合国机构?
请提供细节。

问题六:以前的参与

1.该倡议是否已提交过去3年(2017-2019)的申请?

问题七:联合国公共行政奖

此项目是否已经获得过联合国公共服务奖?

问题八:其它奖励

此项目是否获得过其它公共服务奖?

题 9: 您是如何得知联合国公共行政奖的?

您是如何得知联合国公共行政奖的? UN

题 10: 问题九:确认同意

我同意与相关人员和实体联系,询问有关验证目的的倡议。

问题一:关于此项目

这个项目属于公共部门吗?

问题二:类型

该倡议与UNPSA类别之一相关吗? 提高公共机构效率以达到可持续发展目标
UNPSACriteria
未找到任何项目

问题三:可持续发展目标

此项目是否与17个可持续发展目标中的任一个相关?
如果您在上面问题回答的“是”,请具体说明此项目与哪一个可持续发展目标最相关。
无贫穷
零饥饿
良好健康与福祉
优质教育
性别平等
清洁饮水和卫生设施
经济适用的清洁能源
体面工作和经济增长
产业、创新和基础设施
减少不平等
和平、正义与强大机构
促进目标实现的伙伴关系
此项目与以上列举的可持续发展目标中的哪些具体目标相关?
" 1.1 到2030年,在全球所有人口中消除极端贫困,极端贫困目前的衡量标准是每人每日生活费不足1.25美元 "
" 1.2 到2030年,按各国标准界定的陷入各种形式贫困的各年龄段男女和儿童至少减半 "
" 1.3 执行适合本国国情的全民社会保障制度和措施,包括最低标准,到2030年在较大程度上覆盖穷人和弱势群体 "
" 1.4 到2030年,确保所有男女,特别是穷人和弱势群体,享有平等获取经济资源的权利,享有基本服务,获得对土地和其他形式财产的所有权和控制权,继承遗产,获取自然资源、适当的新技术和包括小额信贷在内的金融服务 "
" 1.5 到2030年,增强穷人和弱势群体的抵御灾害能力,降低其遭受极端天气事件和其他经济、社会、环境冲击和灾害的概率和易受影响程度 "
" 1.a 确保从各种来源,包括通过加强发展合作充分调集资源,为发展中国家、特别是最不发达国家提供充足、可预见的手段以执行相关计划和政策,消除一切形式的贫困 "
2.1 到2030年,消除饥饿,确保所有人,特别是穷人和弱势群体,包括婴儿,全年都有安全、营养和充足的食物
" 2.2 到2030年,消除一切形式的营养不良,包括到2025年实现5岁以下儿童发育迟缓和消瘦问题相关国际目标,解决青春期少女、孕妇、哺乳期妇女和老年人的营养需求 "
" 3.8 实现全民健康保障,包括提供金融风险保护,人人享有优质的基本保健服务,人人获得安全、有效、优质和负担得起的基本药品和疫苗 "
4.1 到2030年,确保所有男女童完成免费、公平和优质的中小学教育,并取得相关和有效的学习成果
4.2 到2030年,确保所有男女童获得优质幼儿发展、看护和学前教育,为他们接受初级教育做好准备
4.4 到2030年,大幅增加掌握就业、体面工作和创业所需相关技能,包括技术性和职业性技能的青年和成年人数
4.7 到2030年,确保所有进行学习的人都掌握可持续发展所需的知识和技能,具体做法包括开展可持续发展、可持续生活方式、人权和性别平等方面的教育、弘扬和平和非暴力文化、提升全球公民意识,以及肯定文化多样性和文化对可持续发展的贡献
5.1 在全球消除对妇女和女童一切形式的歧视
5.2 消除公共和私营部门针对妇女和女童一切形式的暴力行为,包括贩卖、性剥削及其他形式的剥削
5.3 消除童婚、早婚、逼婚及割礼等一切伤害行为
5.5 确保妇女全面有效参与各级政治、经济和公共生活的决策,并享有进入以上各级决策领导层的平等机会
5.a 根据各国法律进行改革,给予妇女平等获取经济资源的权利,以及享有对土地和其他形式财产的所有权和控制权,获取金融服务、遗产和自然资源
6.1 到2030年,人人普遍和公平获得安全和负担得起的饮用水
6.2 到2030年,人人享有适当和公平的环境卫生和个人卫生,杜绝露天排便,特别注意满足妇女、女童和弱势群体在此方面的需求
6.4 到2030年,所有行业大幅提高用水效率,确保可持续取用和供应淡水,以解决缺水问题,大幅减少缺水人数
6.b 支持和加强地方社区参与改进水和环境卫生管理
7.1 到2030年,确保人人都能获得负担得起的、可靠的现代能源服务
7.2 到2030年,大幅增加可再生能源在全球能源结构中的比例
8.1 根据各国国情维持人均经济增长,特别是将最不发达国家国内生产总值年增长率至少维持在7%
8.2 通过多样化经营、技术升级和创新,包括重点发展高附加值和劳动密集型行业,实现更高水平的经济生产力
8.3 推行以发展为导向的政策,支持生产性活动、体面就业、创业精神、创造力和创新;鼓励微型和中小型企业通过获取金融服务等方式实现正规化并成长壮大
8.5 到2030年,所有男女,包括青年和残疾人实现充分和生产性就业,有体面工作,并做到同工同酬
8.6 到2020年,大幅减少未就业和未受教育或培训的青年人比例
8.7 立即采取有效措施,根除强制劳动、现代奴隶制和贩卖人口,禁止和消除最恶劣形式的童工,包括招募和利用童兵,到2025年终止一切形式的童工
8.8 保护劳工权利,推动为所有工人,包括移民工人,特别是女性移民和没有稳定工作的人创造安全和有保障的工作环境
9.3 增加小型工业和其他企业,特别是发展中国家的这些企业获得金融服务、包括负担得起的信贷的机会,将上述企业纳入价值链和市场
10.2 到2030年,增强所有人的权能,促进他们融入社会、经济和政治生活,而不论其年龄、性别、残疾与否、种族、族裔、出身、宗教信仰、经济地位或其他任何区别
16.2 制止对儿童进行虐待、剥削、贩卖以及一切形式的暴力和酷刑
16.6 在各级建立有效、负责和透明的机构
16.7 确保各级的决策反应迅速,具有包容性、参与性和代表性
17.14 加强可持续发展政策的一致性
17.17 借鉴伙伴关系的经验和筹资战略,鼓励和推动建立有效的公共、公私和民间社会伙伴关系

问题四:实施日期

这个项目是否有超过两年的历史?
请提供实施日期。 01 1月 2017

问题五:合作伙伴/利益攸关方

是否有联合国或其相关机构参与此项目?
参与项目的联合国机构?
请提供细节。

问题六:以前的参与

1.该倡议是否已提交过去3年(2017-2019)的申请?

问题七:联合国公共行政奖

此项目是否已经获得过联合国公共服务奖?

问题八:其它奖励

此项目是否获得过其它公共服务奖?

题 9: 您是如何得知联合国公共行政奖的?

您是如何得知联合国公共行政奖的? UN

题 10: 问题九:确认同意

我同意与相关人员和实体联系,询问有关验证目的的倡议。

Nomination form

Questions/Answers

题 1

请简要描述项目所解决的问题或挑战,并具体说明其目标。(最多300字)
This initiative “Mission for Empowerment of Tribal Bonded Laborers” started with the rescue of bonded laborers identified by the District Administration during 2014-2017. Thereafter 101 acres of land was allocated for them in a village called Meesanallur in Vandavasi Taluk where Housing infrastructure along with livelihood activities are provided to them. It aims to address various issues faced by them like Poverty, Illiteracy, Homelessness, Caste based discrimination, Child labor, Gender inequality, Social stigma, Child marriage and Others. All the above issues needed a “Target Specific Innovative Approach” rather than the conventional “One Size Fit All Approach”. The Objectives of the initiative are : Ensuring necessary living conditions to them, Permanent recovery of them from the Bonded labor system, Ensuring decent standard of living, Improving their social status, Providing sustainable source of income, Socio economic empowerment of them, Providing child friendly environment, Shifting to Renewable energy, Improving health consciousness of themselves and their family members, Holistic community empowerment, Educational empowerment, Increasing access to safety financial nets through SHGs, Effective implementation of various government schemes through Convergence, Enhancing Community leadership , Increasing health and nutrition, Increasing their confidence in government welfare and rehabilitative measures, Increasing Community resilience, Increasing the protection of women and children, Reducing migration in seek of Job opportunities, Reducing and nullifying their vulnerability to bondage disaster, Reducing unemployment, Holistic rehabilitation leading to physical and psychological restoration.

题 2

请解释该项目如何与所选类别相关联。(最多100字)
This initiative for Nominations for the UNPSA 2021, is linked to the second category which is Enhancing the Effectiveness of Public Institutions to reach the SDGs. The District Administration have converged and collaborated a total of 21 Government departments under the chairmanship of the District Collector to provide complete rehabilitation for the victims of bonded labor. All the livelihood activities are owned by the beneficiaries and all the decisions relating to social and financial issues are taken in a democratic.

题 3

a. 请具体说明该项目支持哪个/些可持续发展目标和具体目标,并详细说明该项目如何为这些目标的实施做出了贡献。(最多200字)
The SDGs chosen for this initiative, NO POVERTY: by providing sustainable livelihood, education for the younger generation this whole community could be retrieved from the condition they were in, earlier. By promoting profitable income generating activities as providing Milch animals, setting up brick kilns, charcoal making units and Azola cultivation. The next SDG is ZERO HUNGER: it is notable to say that even in this Pandemic season, the Public Distribution System had ensured a community common kitchen was established for the food distribution. The next SDG, GOOD HEALTH AND WELL BEING: these are monitored by the village Nurse for any health, psychosocial for any traumatic situation arising out of the pandemic situation and in general. The next SDG this entails is the GENDER EQUALITY: this initiative promotes this equality through equal job opportunity for both the genders at par, in livelihood activities at brick kiln, charcoal making and Employment Guarantee Scheme related work. The next SDG is QUALITY EDUCATION: through sophisticated Anganwadis, evening activity centers, ensuring school education without any dropouts. Next SDG is the CONVERGENCE: About 21 Government Departments converging in the execution of this initiative, for enhancing the effectiveness of Public Institutions to reach the SDGs.
b. 请描述一下该项目如何在社会、经济和环境方面具有可持续性。(最多100字)
The District Administration has accomplished the social sustainability by eradicating the social stigma associated with them through issuance of citizenship entitlements like Food safety, Comprehensive Health Insurance, Educational facilities for the children. Economic Sustainability is achieved by Rotational and Passive economy model for the livelihood activities in which the beneficiaries after sharing profits will ensure certain quantum of profit gets reinvested into next cycle of production. Environmental sustainability is ensured by inclusion of eco-friendly infrastructure in the project like Solar gas panel, Biogas plant, Vermi compost unit. Grass cultivation for the cows is done within the community housing.

题 4

a. 请解释该项目如何解决特定国家或地区范围内的政府管理、公共行政或公共服务方面的重大缺失。 (最多200字)
With reference to India, Tiruvannamalai District, the significant shortfall faced by the District Administration is that, when this community was freed from bondage, they were provided with conventional Relief and Rehabilitation measures like relief amount, free land and houses for the betterment of their lives. Ironically, the relief amount could not reach many on time, due to lack of identity proof, community certificate and bank accounts. The land provided for housing facilities to be built was very far from habitable environment like school, hospital, transportation. With lack of money, they could not even invest initial investment to avail the free houses sanctioned to them. These short falls were addressed through sustainable mechanisms like creating ownership of the livelihood projects like brick kiln, charcoal making, Paper bag making. They were registered for identity proof, like ration cards, Aadhar cards and open bank accounts, any changes are also immediately taken note of. This community has also been provided with voters’ card for exercising their democratic rights for the first time. The need to educate the children, by providing transportation, funding for higher studies, so that there are no drop-outs has been addressed to.
b. 请描述该项目如何解决国家背景下的性别不平等问题。 (最多100字)
All the livelihood activities are manned by women SHG who will decide requirement of man power on a daily basis. They also look after the management of livelihood activities including bank transaction and preparation of balance sheet. Also all decision making in the community is made by women, as a Human Centered Design. Equal job opportunity for both the genders with equal wages are paid. Membership card for each livelihood activity is given under the name of women indicating women as family head. Additionally, Petrol bunk and the Paper bag Making unit is completely operated by women.
c. 请描述该项目的目标群体是谁,并解释该项目给目标群体带来的改善成果。 (最多200字)
The target group the IRULARS’ who are known for their prowess for catching snakes, rats, venom extractors, tribal clan, perennially illiterate,downtrodden, ignorant of their basic rights to live. This initiative has been taken to rescue, relieve, rehabilitate and empower them. After rescuing them, it was imperative for the District Administration, to provide them with sustainable livelihood, create work opportunities for this tribal group. This was sorted out by building brick kiln, charcoal making units, creating community based self-sufficiency. This project is successful because of convergence of 21 Government Departments at the cost of US $ 2,572,226.47. For instance, earlier they earned merely USD 0.5 per day – USD 3-5 per week, now they are able to earn USD 4 per day – USD 29 per week. On observation, the current income generation status i.e., income of about 25 families engaged in Brick Kiln is about USD 6047 per month, for charcoal it is about USD 4031.80 per month. According to business plan, this earning capacity is expected to double or triple in the next year and thereafter to many folds in the upcoming years, enhancing their quality of life with uniqueness as to see family, as an unit and not individuals.

题 5

a. 请描述该项目是如何实施的,包括关键发展和步骤、监测、评估活动以及年表。 (300字)
This distinctive initiative came into action, when 100 families were rescued from the clutches of the rich landlords, who have had them as bonded laborers for years. Their plight was so worse that the District Administration, sought to give them an alternate housing facility by identifying 101 acres of land in consultation with community at the cost of USD 2,572,226.47. After settled on their housing project, for sustainable economic growth they were provided with livelihood activities like Milch Cows, 143 Milch cows were bought and one cow was given to each family. The aim was that these cows will really give these families a meaningful income, but when cows were not maintained owing to lack of knowledge they were immediately converted as a community asset than individuals. Brick Kiln was set up by the District Administration along with the raw material for making them, they were bought back by the District Administration for their other housing projects. Charcoal unit was set up creating employable opportunities along with the allied raw materials needed. Paper Bag unit has been set up to supply the district demands since plastic ban. Petrol Bunk are being set up in IRULARS’ society, to which effect a land has been identified near highway given to the society, a self-help group has been formed for this purpose at a cost of USD 49724.60. Education has been the prime issue after housing, livelihood, transportation has been provided for children so that they attend school and there are no drop-outs. Older children are being helped with financial assistance for college education. Health camps are being conducted to assess their health conditions. Self-reliance, equal wage pay are also the keys to success for this community empowerment.
b. 请清楚地解释所遇到的障碍以及这些障碍是如何被克服的。(100字)
The major obstacles encountered are: there were lots of hesitation among them to accept any change in their way of living, lack of capacity building among them led to poor maintenance of cows resulting in their death, lack of feeling of togetherness among themselves, fear of losing livelihood, inability to sell milk. These obstacles were overcome by: creation of sustainable livelihood opportunities, pucca housing infrastructure, creation of Integrated cow shed as community asset, inculcating sense of community social responsibility through activities like mass cleaning, procurement of their products directly by Government or selling to private buyers with support of Government.

题 6

a. 请说明在您所在国家或地区,该项目在哪些方面具有创新性。(最多100字)
This initiative is innovative in the following context : not focused on the temporary upliftment of the bonded labors but on their permanent empowerment, did not rely itself on a single source of income due to diverse employment opportunities, with almost every livelihood activity being tribal friendly none needed any specific training for the tribal to get employed, unique mechanism of income sharing – i) Weekly payment of Salary ii) 50% of the profits given as dividend iii) 50% of the remaining will be used for providing soft loans to save them from falling into the trap of money lenders again.
b. 如果相关,请描述该项目是如何从其它国家和地区的成功项目中获得灵感的。(最多100字)
During 2006 as part of Tsunami Relief and Rehabilitation measure the Nagapattinam District Administration was involved in the rehabilitation of 25000 fishermen families who were the major victims of disaster. The district administration not only provided alternative shelter for them but also their traditional occupational needs like Boat, Fishing net, Inland fishing farm. This became one of the successful rehabilitation project which ensured improvement in the physical, economical and psychological wellbeing of the community. The same sustainable rehabilitation model where I have worked as Tsunami Relief and Rehabilitation Officer for 3.5 years is incorporated in this initiative with some advancements.
c. 如果使用新兴技术和前沿技术,请说明这些技术如何整合在倡议中以及如何包含数字政府。 (限制100个字)
This initiative features, usage of digital platforms like Public Distribution system, Unique Identity number for individuals for their health. Smart phone usage is secured through public private partnership for communication, decision making and leadership promotion. Payment of wages for some through the online transactions via banks. The limitation of illiteracy is overcome with smart phones for voice notes, videos and photos. The vision Digital India is implemented for transforming into Digitally empowered society, where people are connected to various departments of the District Administration. Also other frontier technologies like Bio gas plant and Solar Panels were installed on each household.

题 7

a. 根据您的组织信息,该项目有没有转接或适用到其它情况(例如,其它城市、国家、或者地区)?如果有,请说明在哪里以及是如何进行的。(最多200字)
YES, the initiative had been transferred and adapted to other regions of the district : i) the concept of creation of community housing infrastructure was done in 9 regions of the district – Thandrampattu (35 houses), Thellar (49 houses), Kananthampoondi (66 houses), Puthupalayam (15 houses), Pazhaveri (10 houses), Anakkavoor (6 houses), Vembakkam (7 houses), Nallalam (5 houses) and Chengam (90 houses). All these houses were constructed with infrastructures like Interior Roads, Street lights, Water facilities, Transportation facilities and others. ii) the concept of employment marketing platform – Narikuravar Market in Vengikal, Jawadhu corporate office in Jamnamarathur, Mahadeepam Groundnut oil brand in Tiruvannamalai. iii) the concept of Ecological sustainability involving the use of Renewable energy like Solar power – Solar dryer in Jawadhu Hill Mechanical Processing unit
b. 如果尚未转移/适用到其它情况,请描述其转移的可能性。(最多200字)
The potential for transferability can be seen from this initiative as a role model for other housing projects for irulars’ in the near future. The basic accessibility to the housing project, being in remote area, should be strengthened for development services to reach these community. Easy and effective communication should be the next potential, for their progress and to accelerate their contacts with the outside world. The need and emphasis should also be there for technical training, with officers guiding them, to be electricians, welders, carpenters, motor mechanics, so that they curb on migration. The futuristic potential would be to have poultry farming, apart from cows, as there is a growing demand in the community. They can be taught to grow medicinal plants for their own consumption and for pharmaceutical purposes. Apart from grass, fodder, fruits, vegetables growth in the vast area these could also be considered for transferability of this unique housing settlement. Apart from bricks, charcoal they can be trained to be proficient in other spheres of technical based skill sets. It is with this basic set-up being provided, it is the need of the hour that they become more self-sufficient with lives other aspects too.

题 8

a.使用了哪些具体资源(例如财务、人力或其他资源)来实施该项目? (最多100字)
The specific resources needed to implement the initiative : Rural development and Panchayati Raj for implementation of the project, Tamilnadu State Rural Livelihood Mission- Magalir Thittam for all livelihood activities, Tamilnadu Rural Transformation Project for provision of soft loans, Adi Dravida and Tribal Welfare Department for procurement and disbursal of funds into tribal schemes, Industrial Department for the operation of industrial units, Tamilnadu Cooperative Milk Producer’s Federation Department for procurement and distribution of Milk, School Education Department for enrollment of all children in school and ensuring no dropouts in the school and various other departments.
b. 请从财务和机构角度来解释,是什么确保该项目的长期可持续性?(最多100字)
This initiative is the first of its kind to be followed with many housing projects for Irulars, Public Institutions work for the betterment of the most downtrodden, backward community, so the project should by itself be of very sustainable quality, standards wise. This project has cost the District Administration USD 2,568,242.10 Which is seen as a one-time expenditure, for the enhancement and improvement of a very impoverished tribe. This is a big housing settlement in that particular district where this community is predominantly settled. This is sought with the center and state grants given to the District Machinery.

题 9

a. 该项目是在内部还是外部正式评估的?
b. 请描述一下评估是如何进行的以及由谁评估的。 (最多100字)
Internal assessment: The district administration along with 21 government departments has been conducting regular monthly reviews of the project. External assessment: Primary evaluation is done by 2 external agencies i) International Justice Mission(IJM) – Chennai based global organization that protects the most vulnerable from exploitation. ii)National Agro Foundation- Chennai based Charitable trust involved in development activities focusing agenda 2030. Also Secondary evaluation is done by 2 agencies namely Madras School of Social Welfare (MSW) and Madras Christian College(MCC).Both these organizations have worked with Central and State Governments on various forms of human trafficking.
c. 请描述使用的指标和工具。(最多100字)
The indicators are as follows: Infrastructural Development, Livelihood promotion in the project, Capacity building of the community, Social protection of the community, Integration of the services and amenities, Community resilience, Convergence of the departments, Equity among the community for sustainable growth, Creativity in the project, Digitalization in the project. The tools used are: Household survey using android application, Field level Crop data analysis, Direct observation by study team, Focus group discussion, Key Informant Interviews, Constraint and Stakeholder analysis, Sustainability analysis. Overall the project performance and Impact Assessment is assessed using OECD/DAC evaluation principles in line with achieving 2030 agenda.
d. 评估的主要发现是什么(例如,该项目筹集的资源充足、实施质量和面临的挑战、主要成果、倡议的可持续性,影响力等)以及如何利用这些信息为该项目的实施提供资讯 。(最多200字)
The project (convergence of 21 government departments’ stakeholders) has brought the 143 families out of the clutches of bonded labor and has helped them attain self-sustainability. The community are involved in every management process and have now taken a lead role of management with external support. Though the dependency of the community on the implementers is gradually decreasing it is important to create a sustainable community owned structure for sustaining and carrying this forward. There is significant improvement in the development indicators. The scores of the project in various indicator is specified in Page number 13 of Primary Evaluation Report by IJM.

题 10

请描述该项目如何被列入相关的制度环境(例如,它与相关政府机构的关系如何,以及与已运行机构的关系如何)。 (最多200字)
This initiative is a success model with coordination from the Institution, who have been with the community throughout for easy, smooth transition despite the niggling issues within the community. This project has time and again proven to restore hope, faith, belief in the tribal people who are ostracized from the main stream of the society. This institutional relationship has instilled among other things community living where they can handle themselves and the society at large. The participation of about 20 departments of the institution has brought about this huge change in the lives of this tribe. Instead of the people approaching the institutions, for a change they were present before them at the time of need and help. The Institution has played a major role in transforming them from bondage to ownership status. Various livelihood opportunities, self-reliance, sufficiency have been reiterated to the tribal people. The importance of education, awareness of child labor, child marriage has been repeatedly told. The Public Institution has been supporting the community with regular monitoring by appointing a Nodal Officer, who counsels them periodically. Self Help Groups are provided with financial assistance for their livelihood with partial profits being ploughed back.

题 11

2030年可持续发展议程强调协作、参与、合作关系和包容性。请描述哪些利益相关方参与设计、实施和评估计划以及这些参与是如何实现的。 (最多200字)
Collaborative partnership are agreements and actions made by 21 Government departments, Global Non-Profit Organization, Educational Institution and community based Institutions in Meesanallur, consenting organizations to share resources to accomplish a mutual goal of uplifting the beneficiaries of Meesanallur Smart Irulars’ Colony- A global non-profit International Justice Mission, Chennai and an Educational Institution, Madras Christian College, Chennai are coming together for the welfare of this community for enhancing partnership and participatory development. The role of IJM is to effectively coordinate, mobilize the Irulars as well as bridging the gap between the community and the District Administration. They represented the irulars woes, grievances as they are an expert consultant in the issues of bonded labor and human trafficking. The role of MCC, is to organize capacity building and awareness programs for the benefit of the community to retrieve them from their old ways. It is a commendable forethought of the District Administration to have thoroughly studied the problems faced by this community and to have given an overall solution to their problems. The engagement of these stake holders have been done for their expertise on their field, accuracy, solution finders for the tribal community’s woes.

题 12

请描述主要经验,以及贵组织计划如何改进该项目。(最多200字)
The key lessons learned from this initiative: i) Though there is stipulated policy of Government of India for abolition of Bonded Labour system, still there are 0.313 million bonded labours found indicating failure of Sustainable Rehabilitation model. ii) ii) Any problem will resolve only when democratic decentralised study is made involving the stakeholders. iii) iii) Rather than top down approach bottom up approach will give reliable solution. iv) iv) Only financial empowerment of the affected community will not ensure improvement in their dignity of life. The organization plans to improve the initiative with following interventions: i) Formation of community welfare resident association to better represent their grievances. ii) ii) Training on self-governance thereby electing their own leader. iii) iii) Giving physical, social, psychological counselling to ensure them dignified life with improved social status. The District Administration’s well learnt lesson is that, it should not only look for temporary or momentary solutions to the IRULARS’ COMMUNITY’S woes and problems, but, long term, sustainable, improved, enhancing ways and means to their bonded-free years. So that, they too have the belief, faith and hope that they too can see better, goods days, years, ahead, the one which is “FREE OF BONDAGE”.

返回列表

请等候……