Basic Info

提交前请先查看

提名人信息

机构信息

联合国成员国 南非
机构名称 Centre for Public Service Innovation
公共部门机构类型 公共机构
行政层级 国家的
项目名称 Central Supplier Database for whole of government
项目运行年份 1
机构网站 www.Treasury.gov.za

问题一:关于此项目

这个项目属于公共部门吗?

问题二:类型

该倡议与UNPSA类别之一相关吗? Making institutions inclusive and ensuring participation in decision-making
UNPSACriteria
2017.2.1 Introduces an idea, policy, practice or structure that is distinctively new, innovative and unique in the context of a given country or region Enhance the formal and informal participation of all individuals and groups in public decision-making processes or policies, approaches and measures related to public services and other aspects impacting on their lives. Institutionalize and/or strengthen participatory decision-making and consultation processes at the national and local level
2017.2.7 Clearly supports inclusion, participation and engagement of all people, irrespective of sex, age, race or ethnicity, including through focusing on specific groups of the population and especially those in vulnerable situations, so that after the effective implementation of the initiative, all or some of these groups can participate more fully in society and in decision-making.

问题三:可持续发展目标

此项目是否与17个可持续发展目标中的任一个相关?
如果您在上面问题回答的“是”,请具体说明此项目与哪一个可持续发展目标最相关。
体面工作和经济增长
此项目与以上列举的可持续发展目标中的哪些具体目标相关?
8.1 根据各国国情维持人均经济增长,特别是将最不发达国家国内生产总值年增长率至少维持在7%

问题四:实施日期

这个项目是否有超过两年的历史?
请提供实施日期。 08 9月 2015

问题五:合作伙伴/利益攸关方

是否有联合国或其相关机构参与此项目?
参与项目的联合国机构?
全面禁止 核试验 条 约组 织
请提供细节。

Question 6: Supporting documentation

您是否能为该项目提供相关支持文件?

问题七:联合国公共行政奖

此项目是否已经获得过联合国公共服务奖?

问题八:其它奖励

此项目是否获得过其它公共服务奖?
如有,请详细说明。 CPSI Awards

题 9: 您是如何得知联合国公共行政奖的?

您是如何得知联合国公共行政奖的? Through the CPSI

题 10: 问题九:确认同意

我同意与相关人员和实体联系,询问有关验证目的的倡议。

问题一:关于此项目

这个项目属于公共部门吗?

问题二:类型

该倡议与UNPSA类别之一相关吗? Making institutions inclusive and ensuring participation in decision-making
UNPSACriteria
2017.2.1 Introduces an idea, policy, practice or structure that is distinctively new, innovative and unique in the context of a given country or region Enhance the formal and informal participation of all individuals and groups in public decision-making processes or policies, approaches and measures related to public services and other aspects impacting on their lives. Institutionalize and/or strengthen participatory decision-making and consultation processes at the national and local level
2017.2.7 Clearly supports inclusion, participation and engagement of all people, irrespective of sex, age, race or ethnicity, including through focusing on specific groups of the population and especially those in vulnerable situations, so that after the effective implementation of the initiative, all or some of these groups can participate more fully in society and in decision-making.

问题三:可持续发展目标

此项目是否与17个可持续发展目标中的任一个相关?
如果您在上面问题回答的“是”,请具体说明此项目与哪一个可持续发展目标最相关。
体面工作和经济增长
此项目与以上列举的可持续发展目标中的哪些具体目标相关?
8.1 根据各国国情维持人均经济增长,特别是将最不发达国家国内生产总值年增长率至少维持在7%

问题四:实施日期

这个项目是否有超过两年的历史?
请提供实施日期。 08 9月 2015

问题五:合作伙伴/利益攸关方

是否有联合国或其相关机构参与此项目?
参与项目的联合国机构?
全面禁止 核试验 条 约组 织
请提供细节。

Question 6: Supporting documentation

您是否能为该项目提供相关支持文件?

问题七:联合国公共行政奖

此项目是否已经获得过联合国公共服务奖?

问题八:其它奖励

此项目是否获得过其它公共服务奖?
如有,请详细说明。 CPSI Awards

题 9: 您是如何得知联合国公共行政奖的?

您是如何得知联合国公共行政奖的? Through the CPSI

题 10: 问题九:确认同意

我同意与相关人员和实体联系,询问有关验证目的的倡议。

问题一:关于此项目

这个项目属于公共部门吗?

问题二:类型

该倡议与UNPSA类别之一相关吗? Making institutions inclusive and ensuring participation in decision-making
UNPSACriteria
2017.2.1 Introduces an idea, policy, practice or structure that is distinctively new, innovative and unique in the context of a given country or region Enhance the formal and informal participation of all individuals and groups in public decision-making processes or policies, approaches and measures related to public services and other aspects impacting on their lives. Institutionalize and/or strengthen participatory decision-making and consultation processes at the national and local level
2017.2.7 Clearly supports inclusion, participation and engagement of all people, irrespective of sex, age, race or ethnicity, including through focusing on specific groups of the population and especially those in vulnerable situations, so that after the effective implementation of the initiative, all or some of these groups can participate more fully in society and in decision-making.

Question 3: Implementation Date

这个项目是否有超过两年的历史?
请提供实施日期。 08 9月 2015

Question 4: Partners/Stakeholders

是否有联合国或其相关机构参与此项目?
参与项目的联合国机构?
全面禁止 核试验 条 约组 织
请提供细节。

Question 5: Required Supplemental Documents

您是否能为该项目提供相关支持文件?

Question 6: UNPSA Awards

此项目是否已经获得过联合国公共服务奖?

Question 7: Other Awards

Has the initiative won other Public Service Awards? Yes
Comments: CPSI Awards

Question 8: Sustainable Development Goals

此项目是否与17个可持续发展目标中的任一个相关?
如果您在上面问题回答的“是”,请具体说明此项目与哪一个可持续发展目标最相关。
体面工作和经济增长
此项目与以上列举的可持续发展目标中的哪些具体目标相关?
8.1 根据各国国情维持人均经济增长,特别是将最不发达国家国内生产总值年增长率至少维持在7%

Question 9: Validation Consent

您是否反对愿意我们对此项目展开了解以便认证?

How did you know about UNPSA?

How did you know about UNPSA? Through the CPSI

Nomination form

Questions/Answers

题 1

请简要描述该创新项目所涉及的问题/挑战以及该项目所提出的解决方案(600字)
The modernisation of government systems is based on principles of simplification, standardisation and automation of as many business processes as possible. The National Treasury, through the Office of the Chief Procurement Officer (OCPO) embarked on a project of modernising public sector supply chain management. There was significant compliance burden on government departments, municipalities, public entities, state owned enterprises and constitutional bodies when procuring goods, services and works to execute government’s mandate. Public procurement represents approximately R500 billion per year with approximately 700 000 suppliers at the different spheres of government. All state institutions used to be required to keep and maintain a database of prospective suppliers to be used for procuring for goods and services. All prospective suppliers are required to meet certain compliance requirements, amongst others, these entail tax compliance, BBB-EE (Broad Based Black Economic Empowerment) compliance, supplier registration, verification of bank details, certifying that the suppliers are not in the employment of the state, etc. The compliance requirements are equally burdensome for businesses\suppliers as the same documents and certificates are submitted (in original form) to all procuring entities at all spheres of government (264 Municipalities, 170 National and Provincial Departments and approximately 1300 public entities). The cost of duplication and the administrative burden made it exceptionally difficult for suppliers to do business with government in South Africa. There was an urgent need to eliminate unnecessary manual paper based processes and duplication of effort by optimising the technology at our disposal. The Office of the Chief Procurement Officer had the ambition to consolidate the supplier databases of government estimated at between 2500 and 3000 different supplier masters with endless number of duplications. Thus leading to duplication and inc
a. 这个创新项目的总体目的是什么?请描述该创新项目的总体目的(最多400字)。
The central supplier database project aims to: • Reduce cost of doing business with the state; • Simplify the supplier management processes; • Automate supplier registration processes; • Standardise processes of doing business with the state; • Make it easier for SCM practitioners to find suppliers; • Monitor compliance and policy effectiveness; • Centralise the audit function for supplier’s basic compliance information; • Simplify reporting on state spend.
b. 这个创新项目与所选奖项类别有怎样联系? 请描述该创新项目与其奖项类别评估标准的相关联系(最多400字)。
The central supplier database project aims to: • Reduce cost of doing business with the state; • Simplify the supplier management processes; • Automate supplier registration processes; • Standardise processes of doing business with the state; • Make it easier for SCM practitioners to find suppliers; • Monitor compliance and policy effectiveness; • Centralise the audit function for supplier’s basic compliance information; • Simplify reporting on state spend.

题 2

创新项目应该改善人们的生活,特别是通过加强公共服务对实现可持续发展目标有所贡献。
a. 请解释这个创新项目是如何改善公共服务的提供(最多400字)

题 3

a. 该创新项目必须积极影响一群人或某个群体(即:儿童、妇女、老人、残疾人等),并在特定国家或地区的范围内解决公众关心的重大问题。请说明该创新项目是如何处理公共服务相关的重大公众关注问题(最多400字)。
In order to achieve the above, the Office of the Chief Procurement Officer has initiated the Central Supplier Database (CSD) Project. Suppliers that want to do business with the state are required to only register ONCE, to be able to do business with any organ of state without the need to re-register multiple times on multiple databases of different government institutions. This resulting in removing duplication and reduction in the cost of doing business with the state. The central supplier database (CSD) enables prospective service providers to register once-off through a web-based application linked to a central supplier database. It will require capturing of B-BBEE information, tax compliance information, company registration information, Identity verification and any other compliance related information required by government institutions. The supplier will capture information directly and certify correctness and validity thereof. The CSD serves as a secure central master of all vetted supplier information. Through systems integration, the automatic verification of the correctness of the supplied information is done electronically with South Africa Revenue Service, Companies and Intellectual Property Commission, Department of Home Affairs, Government payroll, Tender defaulters and other central databases before an entity is registered on CSD. The CSD carries the tax c
b. 请解释该创新项目是如何积极影响您的国家或地区范围内的一群人(最多400字)。

题 4

在某个特定的国家或地区,这个创新项目必须提出一个创新的理念,一个出众的新方法,或者一个独特的政策或方法,以实现可持续发展目标。
a.请解释为什么在您所在的国家或地区这个创新项目是有创新性的(最多400个字)
Government institution have been maintaining their own supplier’s databases for a number of years. The supplier database concept is not new within the supply chain environment. What makes this project innovative if the fact it pushed boundaries in what was traditionally paper based environment and transformed the environment into a world class paperless environment which is secure and real time updates takes place No more paper copies of compliance certificates as required by the Public Finance Management Act. All mandatory compliance checks and verifications are done real time through systems integration with multiple state entities to ensure seamless registration process, thus making this the first of its kind in the country and the magnitude of the implementation. This is a platform that is used by whole of government. Over 17000 SCM practitioners use the CSD and over 360 000 suppliers registered on a single platform. 710 organs of state utilise the CSD regularly.

题 4b

b. 请描述创新是原创的还是从其他情境改编的(如果知道的话)?(最多400字)
The concept of supplier database has always existed in different form. The CSD automated and enhanced the verification process and simplified the process.

题 4c

c. 调动了哪些资源(即:财力,人力,物资或其他资源等)? (最多200个字)。

题 5

该创新项目可适用于其他情况(如其他城市,国家或地区)。 可能已有证据表明,它在一个特定国家,地区或全球范围内的其他公共部门机构中启发了类似的创新。这个创新项目是否已转移到其他情况?
1. What service delivery improvements have been achieved? South Africa was ranked 42 on the Doing Business 2015 report published by the world bank when compared to other 189 countries. It really takes time and effort for suppliers when they want do business with the state. The Central Supplier Database makes it much easier. The whole project applied batho pele (people first) principles by ensuring that thorough consultation is done with multiple stakeholders, more suppliers (citizens) will now have access to more business opportunities and exposure to magnitude of government institutions which they can do business with. The central supplier database makes it easier for citizens/suppliers to have access to information related to supply chain from one central point, irrespective where the citizen stays – as long as they have access to a mobile telephone device of majority of citizens have more than one device. Access is also provided though public facilities such as Libraries, government offices and local government offices. The National Treasury now has good picture of the suppliers that do business with the state. The data available from the database will allow policy makers to measure impact of government policies and also make it easier to implement new government policies. Recently, the President Jacob Zuma announced that government procurement will be used as a strategic

题 6

这个创新项目应该能够在相当长的一段时间内得到维持。
a. 请说明该创新项目是否可行和如何实现可持续发展(涵盖社会,经济和环境方面以及及时的耐久性)(最多600字)。
The project is managed through the SCM ICT chief directorate which is responsible for using technology efficiently to address service delivery challenges within the supply chain management space in the public service. This project forms a base for the bigger project of enabling eProcurement for goverment. All organs of state (National departments, provincial departments, constitutional bodies, local government and public entities) are required to put in place mechanism to support the central supplier database and ensure that suppliers are assisted to register on ongoing basis. Provincial Treasuries, departments and entities have also been engaged to setup support centres for the central supplier database
b. 请描述该创新项目是否以及如何在耐久性方面持久(最多600字)
The concept of the central database can be adopted and implemented in many spheres of government. Other government institutions can adopt the model for implementing national databases for different purposes. The BBB-EE commission based at the Department of Trade and Industry has also looked at the model to see how a central BBB-EE database can be implemented. The model will definitely assist other organs of state to improve efficiency in their processes, thus improving service delivery.

题 7

该创新项目已经被正式评估,在这其中有显示出一些对改善人民生活的影响的证据。
a. 这个项目是否已经正式评估?
如果是的话,请说明这个项目是如何评估的? (最多400个字)。
South Africa was ranked 42 on the Doing Business 2015 report published by the world bank when compared to other 189 countries. It really takes time and effort for suppliers when they want do business with the state. The Central Supplier Database makes it much easier. The whole project applied batho pele (people first) principles by ensuring that thorough consultation is done with multiple stakeholders, more suppliers (citizens) will now have access to more business opportunities and exposure to magnitude of government institutions which they can do business with. The central supplier database makes it easier for citizens/suppliers to have access to information related to supply chain from one central point, irrespective where the citizen stays – as long as they have access to a mobile telephone device of majority of citizens have more than one device. Access is also provided though public facilities such as Libraries, government offices and local government offices. The National Treasury now has good picture of the suppliers that do business with the state. The data available from the database will allow policy makers to measure impact of government policies and also make it easier to implement new government policies. Recently, the President Jacob Zuma announced that government procurement will be used as a strategic tool for uplifting communities and small businesses.
b. 请描述评估该项目的影响的结果(最多400字)。
请描述使用的指标。(最多400字)。

题 8

该创新项目必须表明,在可能的情况下,它已经涉及到其他机构,民间社会或私营部门等各方的参与。
a. “2030年发展议程”强调合作,参与,协调,伙伴关系和包容性。 请描述哪些利益相关方参与了设计,实施和审查这一创新项目。 还请强调他们的角色和贡献(最多600字)。
The project was a second runner up on State Information Technology Agency awards for Innovative Use of Technology in 2015 and won the Centre for Public Service Innovation award for innovative use of technology for improved service delivery. H. REFERENCES : Betty Rakubu Limpopo Provincial Treasury RakubuMB@treasury.limpopo.gov.za Molefi Moetapele North West Provincial Treasury mmoetapele@nwpg.gov.za Pumezo Gulwa National Treasury Pumezo.gulwa@treasury.gov.za

题 9

a. 请描述您对该创新项目的总体经验,吸取的教训以及你对未来如何进一步提高这一创新项目的看法。
• The biggest challenged experienced is change management. Introducing changes in processes that have been rigid for many years brings a lot of resistance and sceptism in adopting the new way of doing things. • Communication and more communication with affected practitioner and officials to ensure that they understand and adopt the new changes. • Training of officials with different skill levels. • The most important lesson learned is that change management is critical in delivering a project of this magnitude. It’s important that all stakeholders are consulted in all phases of the project. • Having change champions in all affected departments, officials that will sell project throughout their departments is also an important lesson learned in implementing the central supplier database. • Ensuring optimum support structures are in place before full scale implementation. • Robust ICT network infrastructure is in place and thorough testing. • Communication campaigns and engagements with citizens/suppliers.

返回列表

请等候……